Posted by: eekaplanian1 | June 12, 2013

Day 3

 

 

SAMSUNG DIGITAL CAMERA

Brad decided it was better to just take out the old drywall and start fresh after the plumber and electrician were done with this stage and had inspections.

SAMSUNG DIGITAL CAMERA

All the old stuff is taken out – probably was put in when the house was built.

SAMSUNG DIGITAL CAMERAAll ready for the electrician

SAMSUNG DIGITAL CAMERA

Looks a lot different after the plumber finished.  Inspector due tomorrow morning to give it official blessing.

SAMSUNG DIGITAL CAMERA

The shelves may not be in the small cupboard any more, but it’s handy to keep things near where the work is progressing.

SAMSUNG DIGITAL CAMERA

Meanwhile, Brad was working on the sliding door, taking it in and out to understand how it worked.  Turns out the tracks were wood and one of the tracks had a piece missing, hence the door didn’t move much.

SAMSUNG DIGITAL CAMERA

How about that!  The door moves back and forth smoothly in spite of being a little warped.  Ed was sitting in the living room and closed the pocket door – he was amazed at how quiet it was in the room.  Brad was working with noisy machinery and it really blocked a lot of it.

SAMSUNG DIGITAL CAMERA

Same configuration for the night – it has been that way for the last three days.

Advertisements

Tell me what you think, I would enjoy knowing what you have to say.

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: